Inspection Date: September 19, 2019
On-site due to follow-up of failing septic system from previous inspection – on-site sewage system repaired, violation resolved, corrected.
Inspection Date: June 17, 2019
Critical violations: 1 Observed on-site sewage disposal system still failing, with sewage effluent surfacing on ground – must have corrective plan/actions in place at re-inspection or work order will be issued, followed by closure order if violations remain – call when registered septic installer is on-site, with corrective plan. Will re-inspect on July 1, 2019
Non-critical violations: 0 Previous non-critical violations corrected.